The project: protecting M8 bridge columns at Livingston

Hardstaff Barriers was praised for its knowledge, expertise and collaboration following the completion of a major motorway bridge upgrade project.

Hardstaff worked closely with road maintenance firm BEAR Scotland throughout the extensive project on the M8 at Junction 3, in Livingston, which concluded in June 2021.

The M8 is the busiest motorway in Scotland, connecting the country’s two largest cities, Glasgow and Edinburgh, so keeping disruption to a minimum on this highways scheme for Transport Scotland was essential.

High containment concrete barriers installed for the M8 Junction 3 project

High containment concrete barriers protecting bridge columns on the M8 at Junction 3

The solution: REBLOC and Maxibloc high containment barriers

As a leading manufacturer and supplier of road safety barriers with many years’ experience, Hardstaff was appointed to supply new permanent concrete barriers to protect the columns of bridges crossing over the motorway.

REBLOC RB140 and Maxibloc high containment barriers were installed along the verges and on the central reserve, providing maximum protection for the bridge in the event of a collision.

The company’s expert team were engaged from the outset and worked hard to ensure that the project was completed on time and with minimum disruption to traffic, working alongside Highway Barrier Solutions (HBS).

High containment concrete barriers installed under an M8 bridge

REBLOC and Maxibloc barriers along the verge and central reserve

The outcome: an on-time, low-disruption install

“The collaboration with Hardstaff has been excellent from inception to the completion of the project, at all levels. Hardstaff provided guidance to BEAR Scotland at the Preliminary Design stage, regarding their best product for the job. Thereafter, Hardstaff collaborated with BEAR’s designers at Detailed Design stage, providing all the necessary information. Also, Hardstaff assisted with their experience at the Construction Stages, minimising disruption for the road users. Without the use of Hardstaff products at the specific site and location, it would require major works resulting in major delays and disruption. The speed of installation and the quality of the products were a big bonus. Overall, it was a successful project with effortless collaboration between Transport Scotland, BEAR Scotland, Hardstaff and HBS.”

Gerasimos Samoilis – Principal Engineer, BEAR Scotland South East Unit

“We are happy to have been involved in the successful delivery of this project for our client, BEAR, and we are pleased to have contributed to making Scottish roads safer.”

Nigel Dougan – Highway Barrier Solutions (HBS)

“We are thrilled to have had the opportunity to be a part of such an important project, which will ultimately make the road safer for all road users. It has been a pleasure working so closely with all of the highway professionals involved.”

Sarah Compton – Highways Account Manager, Hardstaff Barriers