The problem: vulnerable bridge piers beneath the M74

Transport Scotland is the national transport agency for Scotland, and is responsible for maintaining, upgrading and monitoring the trunk road network across the country.

As part of Transport Scotland’s strategic trunk road maintenance programme, Scotland TranServ delivered the second phase of a £1.8m programme of protection works to the M74 bridge piers.

The piers are located on the A723 between Hamilton and Motherwell, in Strathclyde, below junction 6 of the M74.

A key part of the scheme, which was due for completion in April 2020, involved the construction of three metre-high reinforced concrete collars above ground level within the central reserve.

Additional vehicle safety barriers were also required, providing permanent increased protection to the supporting bridge piers.

REBLOC concrete vehicle restraint systems protecting the M74 bridge piers

REBLOC precast concrete vehicle restraint systems installed to protect the M74 bridge piers on the A723

The solution: REBLOC very high and high containment concrete barriers

As a multi-award winning manufacturer and supplier of concrete roadside safety barriers, Hardstaff was appointed by Scotland TranServ to provide a suitable safety barrier system for this scheme.

The REBLOC RB140SFS_5.5, a surface-mounted precast concrete vehicle restraint system (VRS), providing the highest containment level (H4a), was installed along the verges and slip roads of the A723.

Tested to European Standard EN1317, the barrier can even contain and redirect the impact of a 30-tonne lorry travelling at 65 km/h.

Very high containment concrete vehicle restraint system on the A723 with a lorry passing

REBLOC H4a very high containment barrier on the A723 verge, below the M74

The REBLOC RB84XEAL_8, an embedded precast concrete VRS providing H2 containment, was also installed along the central reserve of the A723, where space was very limited.

The slim product is ideal in tight spaces and can be embedded into just 40mm of asphalt or concrete.

The outcome: continuous protection for the M74 bridge piers

Both products were seamlessly connected to provide a continuous VRS, preventing vehicles from colliding with the M74 bridge piers.

The products were also connected to existing barriers already in place on the A723. Approaches to the lead in end of the barrier have also been protected by our crash cushions.

The barriers now help to keep safe the many thousands of people who use the A723 and the M74 each day.

Close up of REBLOC concrete vehicle restraint system protecting an M74 bridge pier

Close up of the REBLOC concrete barrier protecting the M74 bridge pier

The hard facts

  • Scotland TranServ delivered the second phase of a £1.8m programme of protection works to the M74 bridge piers
  • Vehicle safety barriers were required, providing permanent increased protection of the supporting bridge piers
  • REBLOC RB140SFS_5.5, a free-standing precast concrete VRS, providing the highest containment level (H4a), was installed on the verges and slip roads of the A723
  • The slim REBLOC RB84XEAL_8, an embedded precast concrete H2 containment level VRS, which is ideal in tight spaces, was installed along the central reserve of the A723